We believe a review should be requested for project 7096 which is currently requesting registration (deadline for requesting registration 22 November 2012). According to our research, the DOE has not provided a proper validation of input values related to the calculation of power density, which is a parameter for hydro power projects including reservoirs to determine the amount of project related emissions.

Results Over-crediting analysis PoA 10415
Analysis of the available documents has found that PoA 10415, over the monitoring periods 5, 6 and 7, is likely set to issue 27.4 more