Comments on validation of the Grid connected super-critical technology based power generation in Jharkhand, India

CDM Watch respectfully submits the following comment on the Project Design Document (PDD) for Grid connected super-critical technology based power generation in Jharkhand, India to be developed by Jharkhand Integrated Power Ltd. We highlight the importance of recognizing the integral role of transparency in the CDM validation process, and for taking this comment into consideration.

After careful consideration of the PDD in the given time, we conclude that if approved, this project would lead to the excess issuance of about 1,744,46 Certified Emissions Reductions (CERs) annually beyond any actual emissions reductions. Based on our analysis, this project must not be validated.

Please find embedded the comment in PDF.

Related publications

引領碳定價 步上正軌

碳定價已成為全球許多氣候政策的重要組成部分。若設計與執行得當,將可成為有效且公平減少溫室氣體排放的重要工具。

碳市場觀察(Carbon Market Watch) 根據其在此領域長期累積的專業經驗,提出各國在建立碳定價制度時應優先考量的十項關鍵要素,以確保制度能夠帶來真正的氣候效益,並兼顧民眾與社群福祉。

報告指出,唯有建立在環境完整性、社會公平與充分透明的基礎上,碳定價才能真正發揮其應有作用,成為推動氣候行動的重要政策工具。

Scroll to top

Join our mailing list

Stay in touch and receive our monthly newsletter, campaign updates, event invites and more.