Adani Mundra – Coal power project, India

Adani Mundra

Adani’s thermal power coal power project Grid connected energy efficient power generation (project ref#: 2716) is located in the state of Gujarat, India. This Ultra Mega Power Project is a 1320 megawatt power project comprised of two 660MW units. It was the first supercritical coal power project that was registered under the CDM on 16 December 2009. This coal plant provides power for the port and associated industrial park that, spanning over 100 square kilometers in the largest economic development zone in India.

As the first coal power project to receive carbon credits, the Mundra project has received about 600.000 carbon credits for the period February 2011 to March 2012. Although the French energy giant EDF Trading has informally  stated that they are no longer involved in the project, they remain listed as the buyer on the UNFCCC CDM website.

The Project Design Document (PDD) was conducted on the basis of an erroneous social and environmental impact assessment that failed to recognize fishing communities, salt-pan workers and pastoralists as potentially affected stakeholders. These communities have not been consulted before the implementation of the project and no relevant information has been made accessible in the local languages. Due to the depletion of groundwater and the destruction of mangroves as a result of the constructions for the project, the availability and accessibility of fish is negatively influenced, constituting a threat to the livelihood of the local population.

More..
Coal Power in the CDM

Moreover the Mundra project is awarded carbon credits based on flawed CDM crediting rules that allow significant over-crediting. The CDM Executive Board suspended the crediting methodology for these projects (ACM0013) in 2011. However, projects registered before that date, such as the Mundra project, are still using the old – flawed – methodology.

Concerns about both, additionality as well as negative impacts on the local ecosystems were raised early for ‘Mundra Ultra Mega Power Project‘. In addition to carbon dioxide, coal plants emit large amounts of air pollutants including: sulfur dioxide, which contributes to acid rain; nitrous oxide, a precursor to ozone that harms human health and also contributes to global warming; and other toxic air pollutants including mercury and fly ash. Yet the environmental, human health and social harms are nowhere discussed in the report. This type of superficial treatment of the impacts of the project environment and local stakeholders further risks undermining the legitimacy of CDM projects.

Ultimately, however, the folly lies not in the inaccuracies in the case of the Mundra project or flaws in the methodology itself, but rather in the very notion of devoting scarce CDM funds to construct new coal plants that will spew greenhouse gases for the next 25 years.

What we are calling for:

  • Coal power is neither clean nor sustainable and should be made ineligible for climate finance
  • CDM projects with adverse negative impacts need to repair the damage done
  • Coal fired power projects must stop receiving climate finance immediately!

Read the report about the Adani Mundra CDM project here


For more information about the irony of funding coal power through the CDM, Read more…

Views from Network members:

Author

Related posts

Pricing the priceless: Lessons for biodiversity credits from carbon markets

Biodiversity markets are meant to channel private sector funding towards schemes that aim to conserve and restore biodiversity. In its current form, the unregulated funding schemes are reminiscent of the voluntary carbon market, which has a track record of supplying poor quality, cheap credits that inadequately transfer funds to the Global South. 

Going for green: Is the Paris Olympics winning the race against the climate clock?

Aware of the impact of the games on the climate and of record temperatures on the games, organisers of the Paris games have pledged to break records when it comes to reducing the impact of this mega event on the planet. ‘Going for Green’, a Carbon Market Watch and éclaircies report assessing the credibility of these plans reveals that if completely implemented, only 30% of the expected carbon footprint is covered by a robust climate strategy.

Lost in Documentation

Navigating the maze of project documentation

A new report by Carbon Market Watch has raised concerns over a lack of transparency and accountability within the unregulated voluntary carbon market caused by the unavailability of important project documents from the four biggest carbon crediting standards.

Join our mailing list

Stay in touch and receive our monthly newsletter, campaign updates, event invites and more.