CMW input on draft mechanism methodology: Electricity generation from renewable sources connected to electricity systems (version 02.0)

CMW responded to the call for input on the draft mechanism methodology ‘Electricity generation from renewable sources connected to an electricity system (version 02.0)’. The Methodological Expert Panel agreed at its 14th meeting to recommend this draft methodology for adoption by the Article 6 Supervisory Body at the SBM 022 meeting. The call for input was open from 6 to 13 July 2026. Carbon Market Watch input can be found below. 

Related publications

Scroll to top

Join our mailing list

Stay in touch and receive our monthly newsletter, campaign updates, event invites and more.