CMW responded to the call for input on the draft mechanism methodology ‘Electricity generation from renewable sources connected to an electricity system (version 02.0)’. The Methodological Expert Panel agreed at its 14th meeting to recommend this draft methodology for adoption by the Article 6 Supervisory Body at the SBM 022 meeting. The call for input was open from 6 to 13 July 2026. Carbon Market Watch input can be found below.

Joint letter – Rights-based safeguards in Article 6.4 carbon markets
A total of 112 organisations and individuals from 42 countries across 5 continents signed an open letter addressed to members of the Article 6.4 Supervisory
