Call for input on the draft revised methodology ACM0013 “Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology — Version 4.0.0”. We welcome the opportunity to comment on the draft revision of ACM0013. We asked the Stockholm Environment Institute (SEI) to carefully examine the proposed methodology.

Results Over-crediting analysis PoA 10415
Analysis of the available documents has found that PoA 10415, over the monitoring periods 5, 6 and 7, is likely set to issue 27.4 more