Results

Search news

  • Filter by area

  • Filter by type

  • Filter by category

Search publications

  • Filter by area

  • Filter by type

  • Filter by category

Calibrated bags to measure gas leakage (Newsletter #4)

The Board will decide upon revised methodology AM0023 concerning leak reduction from natural gas pipeline compressor or gate stations. The revision would expand the permitted techniques to measure the flow of gas leaks in natural gas transmission and distribution systems to two more techniques:

Pressure by DOEs to limit their liability (Newsletter #4)

During the next meeting, the Board will consider the “concept of materiality”, which would limit the liability of DOEs for errors in checking data in PDDs and accompanying documents. In theory, DOEs are held responsible for any CER which may be inappropriately issued. In

Subsidies for monoculture tree plantations (Newsletter #4)

Currently, any plantation established on land that was forested after 1 January 1990 is excluded from the CDM. But the CDM EB is now considering a new possibility to include lands with “forests in exhaustion” as A/R CDM project activities. The results will be

CDM Watch Newsletter #4, October 2009

Dear friends,

Just after UNFCCC delegates have battled over the future of the CDM during Bangkok Climate Talks, the CDM Executive Board will meet from 13 – 16 October 2009 in Bangkok to discuss a number of important issues.

Bhilangana III Hydro Power Project: how 24 MW destroy 14 villages

The 24 MW Bhilangana – III Hydro Power Project is currently being established at the Bhilangana river, the tributaries of Bhagirathi River in the Tehri District in the State of Uttarakhand and has applied for CDM in January 2008. Further to some alarming hints

Scroll to top

Join our mailing list

Stay in touch and receive our monthly newsletter, campaign updates, event invites and more.